Design of operation of 4A and 4B quarters of furnace waste dump at the "Dolna Odra" Power Plant

Address:
Nowe Czarnowo

Scope of works:
- Design of operation of 4A and 4B quarters of waste dump at the Dolna Odra Power Plant,
- Legal representation of the Investor in obtaining of permit for operation of furnace waste dump with change of the way of use of that part of waste dump (4A and 4B quarters) from permanent into rotational way.

Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./

Implementation period:
2000-2001



Reclamation of municipal and industrial waste dump with the area of 3.6 ha with use of slag ashes from the power plant and construction of manoeuvring - dump yard on the reclaimed area at the "Dolna Odra" Power Plant

Address:
Nowe Czarnowo 

Scope of works:
- Concept of reclamation of municipal and industrial waste dump,
- Assessment of environmental impact,
- Decision on conditions of building and land development,
- Construction - executive and technological designs,
- Essential decisions and permits, and in this: building permit and decision on reclamation course,
- General execution of construction works,
- Permit for operation and decision on completion of reclamation.


Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./

Implementation period:
1999-2001



Raising of embankments for production waste dump of the Szczecin Power Plant

Address:
Ks. Anny Street, Szczecin

Scope of works:
- Decision on building permit,
- Raising of embankments (1st and 2nd stage), sprinkler system, system for
  distribution of slag and ash mix,
- Preparation of instructions for dump operation,
- Decision on permit for operation.

Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo
/Zespół Elektrowni Dolna Odra S.A./

Implementation period:
2001-2002



Modernisation of furnace waste dump at the "Pomorzany" Power Plant

Address:
Szczawiowa Street, Szczecin

Scope of works:
- Decision on conditions of building and land development,
- Design of protections of the existing production waste dump on the premises of the Pomorzany Power Plant based on the execution of drainage and re-grading of slopes, construction of buttress, pumping station together with pumping pipeline and power terminal,
- Decision on building permit,
- Performance of author's supervision.


Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./

Implementation period:
2001-2002 design, task implementation in progress



Design and execution of experimental plots on the premises of the Dolna Odra Power Plant

Address:
Nowe Czarnowo

Scope of works:
- Decision on conditions of building and land development,
- Design of construction of experimental plots for determination of impact of slag ashes on the environment of underground water; technological design prepared with close co-operation with the Institute of Industrialised Zones Ecology /Instytut Ekolologii Terenów Uprzemysłowionych/ in Katowice under the management of professor Jacek M. Łączny,
- Decision on building permit,
- Execution of plots in the following scope:
- four lysimeters with carrying of water away to the pumping station,
   - pumping station with power terminal,
   - area development with fencing and internal roads.
    

During the implementation, for the Investor's request, we adapted the area for establishment of research model for studying of cultivation on slag ashes by the Academy of Agriculture in Szczecin /Akademia Rolnicza w Szczecinie/ that, on its own, prepared 46 several types of soil mixes and established cultivation.

Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./

Implementation period:
2001-2002



Construction - executive design of area macrolevelling together with execution of a car park on the premises of the "Dolna Odra" Power Plant

Address:
Nowe Czarnowo

Scope of works:
- Decision on conditions of building and land development,
- Construction - executive design of area macrolevelling together with execution of a car park with use of debris from demolition works for macrolevelling,
- Area drainage design and water supply and sewage effluent consent,
- Decision on building permit.

Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo
/Zespół Elektrowni Dolna Odra S.A./

Implementation period:
2001-2002



 
Comprehensive design services in the scope of building and civil engineering industry. Environment protection. Author's and investor's supervision. Geological surveys of soil. Evaluation and turnover of real estates.