Industrial - demonstrative emission control installation with application of electron beam method at the Pomorzany Power Plant in Szczecin

Scope of works:
- Co-ordination of pre-design works,
- Assessment of environmental impact and arrangements with the Ministry of Health and Environmental Protection,
- Decision on conditions of building and land development,
- Assessment of environmental impact at the stage of construction design,
- Decision on design solutions in the scope of environment protection,
- Legal representation of the Investor in obtaining of decision on building permit,
- Legal representation of the Investor in reporting on completion of works and obtaining of permit for operation of installation.

Employer and Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./

Implementation period:
2000-2001



Building development for 4UCK turbine set at the Szczecin Power Plant

Scope of works:
- Co-ordination of pre-design works,
- Assessment of environmental impact and arrangements in the scope of environment protection,
- Decision on conditions of building and land development,
- Assessment of environmental impact at the stage of construction design,
- Geological surveys of subsoil and geological - engineering documentation,
- Decision on design solutions in the scope of environment protection,
- Legal representation of the Investor in obtaining of decision on building permit,
- Legal representation of the Investor in reporting on completion of works and obtaining of permit for operation of installation.

Employer:
ABB Alstom Power Sp. z o.o. in Elbląg

Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./

Implementation period:
1999-2000



Flue gas desulphurisation system for power units 1 and 2 together with auxiliary installations for power units 1 to 8 at the "Dolna Odra" Power Plant in Nowe Czarnowo

Address:
Nowe Czarnowo

Scope of works:
- Co-ordination of pre-design works,
- Assessment of environmental impact and arrangements in the scope of environment protection,
- Decision on conditions of building and land development,
- Assessment of environmental impact at the stage of construction design,
- Geological surveys of subsoil and geological - engineering documentation,
- Decision on design solutions in the scope of environment protection,
- Legal representation of the Investor in obtaining of decision on building permit,
- Legal representation of the Investor in reporting on completion of works and obtaining of permit for operation of flue gas desulphurisation system.

Employer:
Consortium: S-H-L - Umwelttechnik GmbH Malstatter Markt 13 D 66-115 Saarbrucken Germany; SMS - Skandinavisk Miljo Service A/S Selsmosevej 2 DK 2630 Taastrup Denmark

Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./

Implementation period:
1997-2000



Flue gas desulphurisation system for power units 7 and 8 together with chimney for power units 5 to 8 at the "Dolna Odra" Power Plant in Nowe Czarnowo

Address:
Nowe Czarnowo

Scope of works:
- Co-ordination of pre-design works,
- Assessment of environmental impact and arrangements in the scope of environment protection,
- Decision on conditions of building and land development,
- Assessment of environmental impact at the stage of construction design,
- Geological surveys of subsoil and geological - engineering documentation,
- Decision on design solutions in the scope of environment protection,
- Legal representation of the Investor in obtaining of decision on building permit,
- Check-up measurements of acoustics with preparation of designs and execution of noise reducing screens for devices emitting noise above the permissible level,
- Legal representation of the Investor in reporting on completion of works and obtaining of permit for operation of installation.

Employer:
Consortium: MG Engineering Lurgi Lentjes Bischoff GmbH Berliner Str. 93 D 40880 Ratingen  Germany;  POLIMPEX-Cekop ul.Czackiego 7/9 00-950 Warszawa

Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./

Implementation period:
2000-2002



Reinforcement of supporting structure for the Electrostatic Precipitator No. 2 of WP-120 boiler No. 2 at the Pomorzany Power Plant

Address:
"Pomorzany" Power Plant, Szczawiowa Street, Szczecin

Scope of works:
- Decision on conditions of building and land development,
- Design of reinforcement of supporting structure for Electrostatic Precipitator No. 2 of WP-120 boiler No. 2 at the Pomorzany Power Plant
- Decision on building permit.

Employer:
Energobudowa S.A. Power Engineering Construction, branch in Opole
/Budownictwo Energetyczne Energobudowa S.A. Oddział Opole/

Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo
/Zespół Elektrowni Dolna Odra S.A./

Implementation period:
2000-2002



Warehouse for oil waste - building with oil stands, washing stand and pumping station

Address:
Nowe Czarnowo

Area of development:
95,35 m2

Scope of works:
- Decision on conditions of building and land development,
- Designs of all branches as well as technology,
- Decision on building permit.

Employer and Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo
/Zespół Elektrowni Dolna Odra S.A./

Implementation period:
20002-2003



Extension and modernisation of pumping station object within the area of dump of the Szczecin Power Plant

Address:
Ks. Anny Street in Szczecin

Scope of works:
- Design of extension and modernisation of pumping station building in the area of production waste dump of the Szczecin Power Plant,
- Decision on building permit for objects.

Area of development:
210,81 m2

Cubature:
1069,86 m3

Employer and Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo
/Zespół Elektrowni Dolna Odra S.A./

Implementation period:
2002-2003



Noise reducing equipment

Address:
"Dolna Odra" Power Plant in Nowe Czarnowo, "Pomorzany" Power Plant Szczawiowa Street, "Szczecin" Power Plant Gdańska Street in Szczecin

Scope of works:
- Design of noise reducing equipment at the ZEDO S.A. Power Plants,
- Decision on building permit for objects at the Pomorzany Power Plant,
- Report on commencement of works for objects at the Dolna Odra and Szczecin Power Plants,
- Obtaining of "no objection" statements for the commencement of works.

Employer and Investor:

Dolna Odra Power Plant Complex in Nowe Czarnowo
/Zespół Elektrowni Dolna Odra S.A./

Implementation period:
2003



 
Comprehensive design services in the scope of building and civil engineering industry. Environment protection. Author's and investor's supervision. Geological surveys of soil. Evaluation and turnover of real estates.
by studio-online.pl