Industrial - demonstrative emission control installation with application of electron beam method at the Pomorzany Power Plant in Szczecin
Scope of works:
- Co-ordination of pre-design works,
- Assessment of environmental impact and arrangements with the Ministry of Health and Environmental Protection,
- Decision on conditions of building and land development,
- Assessment of environmental impact at the stage of construction design,
- Decision on design solutions in the scope of environment protection,
- Legal representation of the Investor in obtaining of decision on building permit,
- Legal representation of the Investor in reporting on completion of works and obtaining of permit for operation of installation.
Employer and Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./
Implementation period:
2000-2001
Building development for 4UCK turbine set at the Szczecin Power Plant
Scope of works:
- Co-ordination of pre-design works,
- Assessment of environmental impact and arrangements in the scope of environment protection,
- Decision on conditions of building and land development,
- Assessment of environmental impact at the stage of construction design,
- Geological surveys of subsoil and geological - engineering documentation,
- Decision on design solutions in the scope of environment protection,
- Legal representation of the Investor in obtaining of decision on building permit,
- Legal representation of the Investor in reporting on completion of works and obtaining of permit for operation of installation.
Employer:
ABB Alstom Power Sp. z o.o. in Elbląg
Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./
Implementation period:
1999-2000
Flue gas desulphurisation system for power units 1 and 2 together with auxiliary installations for power units 1 to 8 at the "Dolna Odra" Power Plant in Nowe Czarnowo
Address:
Nowe Czarnowo
Scope of works:
- Co-ordination of pre-design works,
- Assessment of environmental impact and arrangements in the scope of environment protection,
- Decision on conditions of building and land development,
- Assessment of environmental impact at the stage of construction design,
- Geological surveys of subsoil and geological - engineering documentation,
- Decision on design solutions in the scope of environment protection,
- Legal representation of the Investor in obtaining of decision on building permit,
- Legal representation of the Investor in reporting on completion of works and obtaining of permit for operation of flue gas desulphurisation system.
Employer:
Consortium: S-H-L - Umwelttechnik GmbH Malstatter Markt 13 D 66-115 Saarbrucken Germany; SMS - Skandinavisk Miljo Service A/S Selsmosevej 2 DK 2630 Taastrup Denmark
Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./
Implementation period:
1997-2000
Flue gas desulphurisation system for power units 7 and 8 together with chimney for power units 5 to 8 at the "Dolna Odra" Power Plant in Nowe Czarnowo
Address:
Nowe Czarnowo
Scope of works:
- Co-ordination of pre-design works,
- Assessment of environmental impact and arrangements in the scope of environment protection,
- Decision on conditions of building and land development,
- Assessment of environmental impact at the stage of construction design,
- Geological surveys of subsoil and geological - engineering documentation,
- Decision on design solutions in the scope of environment protection,
- Legal representation of the Investor in obtaining of decision on building permit,
- Check-up measurements of acoustics with preparation of designs and execution of noise reducing screens for devices emitting noise above the permissible level,
- Legal representation of the Investor in reporting on completion of works and obtaining of permit for operation of installation.
Employer:
Consortium: MG Engineering Lurgi Lentjes Bischoff GmbH Berliner Str. 93 D 40880 Ratingen Germany; POLIMPEX-Cekop ul.Czackiego 7/9 00-950 Warszawa
Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo /Zespół Elektrowni Dolna Odra S.A./
Implementation period:
2000-2002
Reinforcement of supporting structure for the Electrostatic Precipitator No. 2 of WP-120 boiler No. 2 at the Pomorzany Power Plant
Address:
"Pomorzany" Power Plant, Szczawiowa Street, Szczecin
Scope of works:
- Decision on conditions of building and land development,
- Design of reinforcement of supporting structure for Electrostatic Precipitator No. 2 of WP-120 boiler No. 2 at the Pomorzany Power Plant
- Decision on building permit.
Employer:
Energobudowa S.A. Power Engineering Construction, branch in Opole
/Budownictwo Energetyczne Energobudowa S.A. Oddział Opole/
Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo
/Zespół Elektrowni Dolna Odra S.A./
Implementation period:
2000-2002
Warehouse for oil waste - building with oil stands, washing stand and pumping station
Address:
Nowe Czarnowo
Area of development: 95,35 m2
Scope of works:
- Decision on conditions of building and land development,
- Designs of all branches as well as technology,
- Decision on building permit.
Employer and Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo
/Zespół Elektrowni Dolna Odra S.A./
Implementation period:
20002-2003
Extension and modernisation of pumping station object within the area of dump of the Szczecin Power Plant
Noise reducing equipment
Address:
"Dolna Odra" Power Plant in Nowe Czarnowo, "Pomorzany" Power Plant Szczawiowa Street, "Szczecin" Power Plant Gdańska Street in Szczecin
Scope of works:
- Design of noise reducing equipment at the ZEDO S.A. Power Plants,
- Decision on building permit for objects at the Pomorzany Power Plant,
- Report on commencement of works for objects at the Dolna Odra and Szczecin Power Plants,
- Obtaining of "no objection" statements for the commencement of works.
Employer and Investor:
Dolna Odra Power Plant Complex in Nowe Czarnowo
/Zespół Elektrowni Dolna Odra S.A./
Implementation period:
2003
|